Cadets and adults of Angus and Dundee Battalion’s Newport Detachment will use the facility, and several of them were present for the opening held in accordance with COVID-19 social distancing measures. The building forms one part of HRFCA ’s ?1.4-million programme of cadet building replacements.The ?330,000 building was a first for Highland RFCA , being a modular design specifically built for installation on the site of former Spooner huts. It was designed to the specifications of the ...